



































































































Dubai · United Arab Emirates
A licensed Dubai contractor delivering complex renovation, fit-out, and MEP under one accountable team, from authority approvals to a tested, documented handover. Since 1995.
180+
Projects
280k+
SQM Delivered
1.26BAED
PROJECT VALUE
31YRS
in operation
Why City Contracting
Aligned with approved designs and UAE authority requirements.
Planned around actual site and technical conditions.
With engineers monitoring every stage of delivery.
Transparent progress, challenges, and next steps.
What kind of contractor we are
Hotels, commercial spaces, villas and major renovations demand more than workmanship. They require coordination, technical control, disciplined planning and experienced site management.
01
02
03
04
OUR SERVICES
The full scope carried in-house, from authority approvals and MEP to interior fit-out, furniture, and landscape. One team, from mobilization to a tested handover.
01
Permits · NOCs · DET
02
Demolition · Waterproofing
03
HVAC · Electrical · Plumbing
04
Joinery · Stone · Flooring
05
FF&E · Artwork
06
Facades · Landscape · Pools
07
Programme · QA/QC · HSE
08
Commissioning · Handover
Contracted individually or as one design-and-build package
LEARN MORE
featured PROJECTS
Completed villa renovations, hotel fit-outs, and commercial projects across Dubai, delivered end to end.
Full project dossier available on enquiry
FEATURED WORK
authorities
We work within the frameworks set by the UAE's governing bodies, so every project is delivered to the standards they require.




































INDUSTRIES WE SERVE
Each sector carries its own constraints, live operations, private access, landlord conditions, wet-area engineering. The programme is written around them.

01
Operating hotels, resorts, and serviced residences. Works are phased around live guest floors, with noise windows, lift access, and room release agreed before mobilization.

02
Private villas, penthouses, and family compounds. Single-client projects where discretion, finish tolerance, and bespoke joinery set the standard, and the client is present throughout.

03
Headquarters, offices, retail, and showrooms. Coordinated against landlord conditions, base-build MEP capacity, and fit-out approvals, on a programme that protects the opening date.

04
Clubhouses, spas, wellness suites, and recreational venues. Technically dense scopes with pools, wet areas, and specialist plant, where waterproofing and sequencing carry the project.
Sector experience across the Emirates since 1995
LEARN MORE
CLIENT FEEDBACK
Each comment is shown with the project it came from, sector, scope, and year.

01
“
They ran our refurbishment around a hotel that never closed. Floors came back on the dates we were given, and the snag list at handover was the shortest I have signed off.
Hospitality Group
Operations Director · Hotel Group
Project
Hotel refurbishment, Downtown Dubai
Scope
Hospitality · 4,200 SQM · 2024

02
“
Approvals, inspections, and variations were documented as they happened. At no point was there an argument about where the project stood or what it had cost.
Commercial Developer
Development Manager · Commercial
Project
Headquarters fit-out, Business Bay
Scope
Commercial · 1,800 SQM · 2024

03
“
Details other contractors called impossible were set out, agreed, and built to the millimetre. The finish is the reason we would use them again.
A. Rahman
Private Client · Residential
Project
Private villa, Emirates Hills
Scope
Residential · 620 SQM · 2025
Worked with us before?
Add your comment.
If City Contracting has delivered a project for you, we'd welcome your account of it, published only with your approval.
Leave a Comment
COMMON QUESTIONS
The practical questions clients ask before a contract is signed, answered plainly.
Do you handle authority approvals and permits?
Yes. Permits, NOCs, and authority submissions are managed in-house during pre-execution, before any trade mobilizes. You receive the approved set, not a list of pending applications.
Can you work inside an occupied building?
Routinely. Occupied hotels, offices, and residences are phased around live operations, with noise windows, service-lift access, hoarding, and floor release schedules agreed with the operator before we start.
How is pricing structured?
Fixed lump sum against a defined scope, or a re-measurable contract where the scope is still developing. Either way you receive a priced bill of quantities, not a single headline figure.
What is a typical programme length?
Scope-dependent. A single-floor commercial fit-out typically runs eight to fourteen weeks; a full villa six to twelve months. A dated programme is issued before contract, not after.
Do you provide design, or only build?
Both. We deliver design-and-build under one contract, or execute a consultant's drawings as main contractor. In either case one party carries responsibility for the result.
What happens after handover?
A twelve-month defects liability period with one named point of contact, full O&M documentation, and as-built drawings issued at closeout.
get in touch for any further questions you may have.
start a project
blog
Field notes on execution, from MEP and occupied-site renovation to the last piece of furniture in the room.
Written by the team that ran the job
All articles

CONTACT THE team
Speak to the team directly about a villa renovation, hotel fit-out, or premium commercial project. Every enquiry is answered within one working day.
Studio
Diamond Business Center, Arjan, Dubai · United Arab Emirates
studio@citycont.com
Telephone
+971 54 666 4797
Hours
Monday to Friday · 09:00 to 18:00